Posts Tagged ‘English’
No.11 Grampian Road, Kln
No.11 Grampian Road, Kowloon Foundations, ELS for the Proposed Residential Redevelopment Pre-bored Socketed Steel H-piles Soldier Piles Construction Period: 11/2012 – 02/2014
Read MorePublic Library and Indoor Services Recreation Centre in Area 3, Yuen Long
Area 3, Yuen Long The Construction of Piled Foundation and Caps for Public Library and Indoor Services Recreation Centre Raft Foundation Construction Period: 07/2010 – 02/2014
Read More92-98 High Street, Hong Kong
92-98 High Street, Hong Kong Foundation, Excavation and Lateral Support and Pile Cap Works Pre-bored Socketed Steel H-piles Construction Period: 06/2013 – 10/2014
Read MoreNo.19, 21-23 Dai Shing Street, Tai Po, N.T.
No.19, 21-23 Dai Shing Street, Tai Po, N.T. Proposed Development Driven Steel H-piles Construction Period: 12/2014 – 06/2015
Read MoreSai Kung, Hong Tsuen Road, N. T.
Sai Kung, Hong Tsuen Road, N. T. Site Formation, Foundation and Pile Cap Works Pre-bored Socketed Steel H-piles Driven Steel H-piles Construction Period: 12/2015 – 07/2017
Read MoreHong Kong – Zhuhai – Macao Bridge, Hong Kong Boundary Crossing Facilities, Clearance Building
Hong Kong – Zhuhai – Macao Bridge Foundation Works for HY/2013/01 Hong Kong Boundary Crossing Facilities, Clearance Building Pre-bored Socketed Steel H-piles Construction Period: 12/2014 – 03/2016
Read MoreNKIL 6527, Kai Tak Area II, Area 3, Kowloon
NKIL 6527, Kai Tak Area 1I, Area 3, Kowloon Foundation, Basement Excavation & Lateral Support, Pile Cap and Hoarding Works for the Proposed Residential Development Driven Steel H-piles Construction Period: 02/2015 – 04/2016
Read MoreNos. 8-12 Deep Water Bay Drive, Rural Building Lot No. 1190
Nos. 8-12 Deep Water Bay Drive, Rural Building Lot No. 1190 Foundation, Excavation & Lateral Support, Basement and Ground Floor Structure Works for Proposed Residential Development Large Diameter Bored Piles Pre-bored Socket Steel H-piles Soldier Piles/Pipe Piles Construction Period: 08/2013 – 05/2016
Read MoreDepartment Quarters for Immigration Department
20 Heng Lam Street, Lok Fu, Kowloon Department Quarters for Immigration Department Foundation Subcontract Works Pre-bored Socketed H Pile Construction Period: 01/2016 – 10/2016
Read MoreFuk Wing Street, Sham Shui Po
Fuk Wing Street, Sham Shui Po Foundation Works for Residential Development Large Diameter Bored Pile Pipe Pile Excavation Lateral Support Pile Cap Construction Period: 12/2015 – 12/2016
Read More